Site-96 Termination Records

The following log details the termination procedures undertaken at Site-96 on cycle 437. The primary objective of the operation was to contain a subject classified as Keter designation. Initial reports indicate that the termination protocol was unsuccessful with minimal collateral damage. Subject containment breach occurred at approximately 02:59 l

read more

Incident Report: Site-96 Containment Breach

This documentation serves as a formal record of the containment breach occurring at Site-96 on timestamp. At approximately hours, anomalous activity originated within Perimeter 4. A violent surge of power resulted in the breach of multiple containment fields. Several personnel were exposed during the incident. A full-scale investigation into the

read more

Log Entry: Site-96 Incident Report

A series of unexpected events unfolded at Site-96 on this period of May. Preliminary reports suggest a compromise of containment protocols, resulting in the escape of an unknown entity. Security personnel were immediately mobilized to isolate the situation. Further investigation is currently pending. A full summary of the incident will be submitted

read more